United Airlines Flight Training Center
Project Overview
FMW proudly completed a landmark project at the United Airlines Flight Training Center in Denver—one of the most advanced aviation training facilities in the world. As part of United’s $145 million expansion, the newly constructed 150,000-square-foot building now houses 12 cutting-edge full-motion flight simulators, dramatically increasing the center’s training capacity to over 32,000 events per year, supporting up to 860 pilots daily.
This expansion reflects United’s commitment to safety and operational excellence—and FMW’s expertise was instrumental in bringing this vision to life.
FMW’s Scope
FMW was selected to provide design, fabrication, and installation services for a wide array of structural and miscellaneous metal components, all engineered to support the complex demands of modern pilot training. Key deliverables included:
(4) Five-Story Stair Cores
654 total stair risers
1,970 linear feet of railing
373 linear feet of wall railing
Two stair cores featured a modern stainless steel wire design
(6) Simulator Access Platforms
Each shared by a pair of simulators for streamlined access
Custom-built to support advanced equipment and heavy daily use
Additional Structures
Penthouse stair and exterior penthouse stair
Roof access ladder
Robust support structures for all simulator units
FMW's Expertise
Through innovative design and precise engineering, FMW delivered solutions that not only met but exceeded the stringent requirements of the aviation industry. Our team's expertise ensured that every component was crafted to perfection, providing United Airlines with a training environment that is both state-of-the-art and reliable.
Project Highlights
Precision Engineering Every element was designed to meet or exceed aviation standards, ensuring durability and flawless integration with training operations.
Safety & Compliance All work was executed in full accordance with industry regulations, emphasizing FMW’s unwavering commitment to safety.
Timely Execution The project was delivered on schedule, showcasing FMW’s ability to manage complex, high-stakes timelines.
Innovative Design From functional platforms to architecturally distinctive rail systems, our work balanced utility with aesthetics.
Delivering Operational Excellence
This project underscores FMW’s capability to deliver high-performance metal solutions for mission-critical environments. The successful integration of our stair systems, access platforms, and support structures enhances both the operational efficiency and visual quality of the training center—contributing to United’s ongoing pursuit of excellence in pilot training.
FMW is proud to have played a pivotal role in a facility that trains the flight crews who keep the skies safe. The United Airlines Flight Training Center Expansion is a testament to our ability to innovate, execute, and deliver—no matter the scale or complexity. Read more
Project Location
Denver, CO, USA
Project Details
Industry
Aviation
Services
Railing, Platforms, Access Ladder, Stair Risers
Stair Risers
654
Linear Feet of Railing
2343
Year Completed
2024
General Contractor
Turner